CONTROL TOWER SOUTH TERMINAL 1 BARCELONA AIRPORT (2009-2010)
AS HEAD OF THE BUILDING STRUCTURES DEPARTMENT FCC CONSTRUCCIÓN CATALUÑA:
Audit of the project of structures in the pre-construction phase.
Proposal and justification of an alternative connection between lower concrete floor slabs and shaft of the tower.
Proposal and justification of the anchor plates in the tower shaft of the upper metal floors.
Resized of the floors of the auxiliary building due to changes in dimensions and holes.
Continuous support to the technical team of work in the construction phase to provide solutions to unforeseen events and incidents of a structural nature (errors of execution, resistance drops, structural elements not included in the project, etc.).