MRW HEADQUARTERS OFFICES IN BARCELONA (2011-2012)

AS HEAD OF THE BUILDING STRUCTURES DEPARTMENT FCC CONSTRUCCIÓN CATALUÑA:

  • Audit of the project of structures in the pre-construction phase.

  • Study and executive project of an alternative proposal for the retaining walls of perimeter lands.

  • Study and executive project of an alternative proposal for the mixed pillars of the building that are very complicated to execute.  An increase in concrete strength was proposed to eliminate embedded metal profiles.

  • Project for the foundation of the tower crane using pile caps.

  • Checking the structural elements of the singular façade.

  • Continuous support to the technical team of work in the construction phase to provide solutions to unforeseen events and incidents of a structural nature  (errors of  execution, resistance drops, structural elements  not contemplated in the project, unforeseen machinery loads on floors).