top of page

DIAGONAL ZERO ZERO TELEPHONE TOWER (2009-2010)

AS HEAD OF THE BUILDING STRUCTURES DEPARTMENT FCC CONSTRUCCIÓN CATALUÑA:

  • Structural checks of the earth containment screens under study.

  • Audit of the project of structures in the pre-construction phase.

  • Alternative proposal for connecting slabs to the concrete core using a “couplerbox” to speed up the construction process.

  • Continuous support to the technical team of work in the construction phase to provide solutions to unforeseen events and incidents of a structural nature  (errors of  execution, resistance drops, structural elements  not contemplated in the project, unforeseen machinery loads on floors).

  • Structural verification of the elements of the curtain wall.

bottom of page