top of page
DIAGONAL ZERO ZERO TELEPHONE TOWER (2009-2010)
TORRE DIAGONAL ZERO ZERO BARCELONA
FACHADA TORRE DIAGONAL ZERO ZERO
Proceso constructivo
TORRE DIAGONAL ZERO ZERO BARCELONA
1/27
AS HEAD OF THE BUILDING STRUCTURES DEPARTMENT FCC CONSTRUCCIÓN CATALUÑA:
Structural checks of the earth containment screens under study.
Audit of the project of structures in the pre-construction phase.
Alternative proposal for connecting slabs to the concrete core using a “couplerbox” to speed up the construction process.
Continuous support to the technical team of work in the construction phase to provide solutions to unforeseen events and incidents of a structural nature (errors of execution, resistance drops, structural elements not contemplated in the project, unforeseen machinery loads on floors).
Structural verification of the elements of the curtain wall.
bottom of page